Trex Stairs – How to Buid Stair Railing

Trex Stairs – How to Buid Stair Railing

1. What are Trex composite decks?

Many homeowners, particularly those who live in modern homes, are likely to contemplate the installation of Trex stairs in their staircases. Trex is the perfect solution for your decking and one of the most widely used building materials on the market right now. I think it’s the perfect combination of artificial and natural elements. The following information is for those of you who are unfamiliar with Trex stairs construction and why it is ideal for modern homes.

There are a variety of Trex stairs treads, made from treated lumber. They have Trex transcend, Trex select, with different color patterns.trex fascia boards

2. The advantages of Trex stair composite decking

a. High quality

Trex Company is famous for the manufactured composite of wood fibers and plastic resin. The result is a durable, non-rotting material that is difficult to wrap. Because of this, staircases made of this material are going to last longer than those made of other materials. In order to ensure their functionality outside of the house, you should install this

b. Low maintenance cost

The stairs don’t need to be cleaned and swept on a regular basis. The Trex stairs are extremely durable and easy to maintain. The stair will last for a long time without needing a lot of attention. Stair railings and locks, such as the Trex stair railing, can be customized to match the stair’s aesthetics while also ensuring low maintenance costs.

c. Mold and mildew resistance

Composite decking materials are created by combining wood fibers with plastic to form a composite material. Several manufacturers have been named in class-action lawsuits, primarily as a result of complaints from consumers that the wood-lookalike contains mold. Trex, a well-known manufacturer of composite decking, claims that mold will not cause damage to the deck board’s surface.

d. Stain warranty

You can rest certain that your backyard investment is properly secured because our 25-Year Limited Residential Warranty covers practically every product. Also advantageous is that our high-performance decking products are backed by an additional 25-Year Limited Residential Fade and Stain Warranty, which provides an additional layer of protection.

3. The process of building deck stairs treads

a. Measure the stairMeasure your stair

Decide where you want your lowest step to be located. Prepare your decking by placing a long level on top of it and measuring its height at the point where you want your steps to stop. This measurement will be used to establish the number and height of risers required.

b. Creating Trex stairs landingStairs landing with composite boards

Installing concrete footers and posts, as well as securing the stringers to the posts, is one method of creating a landing.

A concrete pad is another type of landing surface that is commonly used. A concrete pad will be placed on top of a 4-inch layer of gravel to serve as the landing for this deck, which will extend approximately 36 inches beyond the steps. Check your local code to ensure that you are aware of any special requirements for your location.

c. Cutting the stringerStair stringer

After determining the rise and run and installing the landing, stringers can be marked on 2 x 12s.

Pre-cut a 2×8 width of the steps to support your stringers below the deck rim or end joist. Attach the board to the joist using the same 2x lumber.

Brace the support board’s back against a joist or beam with 2 lumber. joist hangers or deck screws

Fix a stringer to a hanger and place it against the support board, with the stringer’s top flush with the joist’s. Affix the hanger to the support board

Remove the stringer. Nail and screw the hanger to the deck.

Drill pilot holes and nail or screw the hanger to the stringers inside. Continue with the remaining stringers.

Fit 2 x 4s between the stringers at the concrete pad. So they’ll act as cleats to keep the stairs secure. Attach the cleats between the stringers, face down on the pad.

Drill into the pad with a masonry bit.

Fix the cleats to the pad with concrete anchors. Secure 4 x 4 posts to stringers with bracing, anchors, and carriage bolts. Install the railing posts as described in How to Build a Deck: Wood Decking and Railings. Remove toe kicks and treads. The treads should be an inch over the toe kicks. Drill pilot holes and screw the ends to the stringers.

d.Attach and connect stringer

Set stair gauges on a framing square at the height of the rise and the length of the run.

Hold the square at the corner of a 2 x 12 inches board and mark the top run.

Slide the square along the plank, and mark both rise and run for the next step. Continue marking until you have the correct number of steps laid out.

At the run mark you made for the top step, subtract the thickness of the toe kick and strike a perpendicular cut line. This line indicates where the stairs attach to the deck. There won’t be a toe kick at this point of the stairs.

At the bottom step, subtract the thickness of a tread from the rise and mark a line perpendicular to the rise. This is a cut line to allow you to shift the entire set of stairs down. When the treads are installed, this cut will make the bottom step the same height as the others.

Cut the stringer with a circular saw and finish the cut for each step with a handsaw. Use this stringer as a template to mark and cut the others.

4. The process of attaching balusters to your Trex deck

a. Attach Pressure-Treated PostsStep 1

When placing posts, verify the railing’s real lengths and adjust the posts accordingly. They should be spaced 6′ or 8′ apart to allow the railing’s length. You’ll use 12″ carriage bolts to attach the posts once the right length has been determined. If you’re going to use 2-inch by 8-inch joists, remember that the top bolts must be positioned 1 inch from each other and the bottom bolts must be positioned 5-and-a-half inches below the top bolts.

Additionally, you can countersink the bolts flush with the framing to accommodate the fascia attachment. Blocking can be installed for enhanced strength; consult your local building code official for details. The connection of the posts is a vital component of a railing system. Ascertain that all applicable local building codes are understood and adhered to.

b. Attach Post Sleeve Skirts and Post SleevesStep 2

Next, glide the post sleeve skirt above your post until it rests on the deck surface. Then, position the post sleeve inside the post sleeve skirt.

c. Installing Railing Bracket and  Cutting Railings and Baluster SpacersStep 3

To begin, insert the railing support brackets It is critical that the top are placed flat-side up and the bottom RSBs are placed flat-side down.

Once installed, fasten the RSBs with the included 2″ wood screws and remove the template. Rep for the remaining seats.

You should ascertain that plumb post sleeves. Rails should be snapped into baluster spacers and placed between posts, ensuring that baluster holes are evenly spaced from each post. The size of your baluster spacers should be the same in length as your rail. Once the rails have been cut, remove the baluster spacers.

d. Make a foot block hole and attach the bottom railStep 4

Attach the foot blocks to the bottom rail by inverting it, centering it, and drilling a 3/16″ hole through it. In this location, the foot block attachment will be installed as the final piece to be installed.

Begin by installing the crown rail on the RSBs when you’re ready to attach the top rail to the wall. Afterward, use three self-tapping screws to secure the top rail to the RSB (provided). In the RSB, use the three outer holes rather than the one closest to the post, just as you did with the bottom rail attachment.

e. Make placement and attach balusterStep 5

Snap-in the lower baluster spacer while the bottom rail is still attached. Invert the arrangement of the pieces and place the upper spacer on top of the lower spacer (it will slide up the balusters in a subsequent step).

It is vital that the balusters are properly set in the channel by inserting them into the baluster spacers and checking that they are entirely seated. Insert the balusters at an angle into the top rail.The top baluster spacer can be snapped onto the top rail by inverting the spacer.

f. Installing Post Caps and Install FootblocksStep 6

You’re almost done. Finally, use silicon or PVC adhesive to secure your post tops. Before the silicone or glue has a chance to dry, use blue painter’s tape to keep the post tops in place. Another tip is: Before the adhesive dries, remove any excess.

To reach Decking Pros NW, contact the browser below for more information:

Website: https://deckingprosnw.com//

Phone: (206) 279-1450 or info@deckingprosnw.com

Leave a Reply

Your email address will not be published.